Trains from ABU ROAD to REWARI JN.
Currently, there are 18 trains operating between ABU ROAD and REWARI JN., covering a distance of approximately 600 km. The earliest departure is the 09425 SBIB-HW SPECIAL at 00:25, and the fastest option is the 22949 BDTS DEE SFAST , which completes the journey in 8h 48m.
Available Trains
Listing timetable data for connecting routes
09523
OKHA-SHAKURBASTI SPECIAL
Runs On:MTWTFSS
21:25
ABR
Day 1
11h 3m
664 km
08:28
RE
Day 2
Frequently Asked Questions
How many trains run from ABU ROAD to REWARI JN.?
Based on current schedules, there are 18 trains operating between ABU ROAD and REWARI JN..
Which is the fastest train on the ABU ROAD to REWARI JN. route?
The fastest train on this route is the 22949 BDTS DEE SFAST , which covers the 600 km distance in 8h 48m.
Popular Train Routes
Trains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains BetweenTrains Between
SABARMATI BG(SBIB)
ABU ROAD(ABR)
ABU ROAD(ABR)
SABARMATI BG(SBIB)
SABARMATI BG(SBIB)
REWARI JN.(RE)
REWARI JN.(RE)
SABARMATI BG(SBIB)
HARIDWAR JN(HW)
ABU ROAD(ABR)
ABU ROAD(ABR)
HARIDWAR JN(HW)
HARIDWAR JN(HW)
REWARI JN.(RE)
REWARI JN.(RE)
HARIDWAR JN(HW)
SHRI MATA VAISHNO DEVI KATRA(SVDK)
ABU ROAD(ABR)
ABU ROAD(ABR)
SHRI MATA VAISHNO DEVI KATRA(SVDK)
SHRI MATA VAISHNO DEVI KATRA(SVDK)
REWARI JN.(RE)
REWARI JN.(RE)
SHRI MATA VAISHNO DEVI KATRA(SVDK)
BANDRA TERMINUS(BDTS)
ABU ROAD(ABR)
ABU ROAD(ABR)
BANDRA TERMINUS(BDTS)
BANDRA TERMINUS(BDTS)
REWARI JN.(RE)
REWARI JN.(RE)
BANDRA TERMINUS(BDTS)